DPP checklist — 12 things to prepare before the deadline

A working DPP program is mostly data collection, not software. This checklist maps what your company needs to have ready — in the order teams actually hit the work. Batteries apply from 18 February 2027 (EU 2023/1542); the same pattern holds for other ESPR groups.

The 12 steps

  1. Confirm your product group and deadline — identify which EU act covers you (batteries: EU 2023/1542; others: ESPR delegated acts)
  2. Assign one owner — one person responsible for passport data quality and updates
  3. Collect product identifiers — GTIN or equivalent product code + serial/batch scheme for item-level passports
  4. Map the required attribute set — e.g. Annex XIII for batteries; on MCL-DPP the group schema shows exactly which fields the regulation expects
  5. Gather manufacturer/operator data — company legal data, facility, contact points
  6. Collect compliance documents — declarations of conformity, test reports, certificates, labels
  7. Get supplier data — materials, substances of concern, origin — start requests early; suppliers are the slowest link
  8. Prepare the carbon footprint input — energy, transport, materials data; MCL-DPP's built-in LCA screening calculator (49 factors) produces the screening figure
  9. Compile circularity data — recycled content, repairability, disassembly and recycling instructions where required
  10. Run a pilot passport — pick one real product, fill the schema, run the readiness check, issue and scan its QR
  11. Plan the registry path — who is the operator of record (you or the EU importer), and which seal/identification route applies — QSeal guide · Registry steps
  12. Set the update process — a passport is versioned living data; define who updates it on product/recipe changes

What usually takes longest

Not the platform — the supplier data and the carbon footprint. If you start those two streams now, the rest is mechanical. Companies that wait for their buyers to force the issue will be collecting data under deadline pressure.

Where MCL-DPP fits

Steps 4–9

Group schemas, document fields and the built-in carbon calculator cover the data work.

Step 10

Readiness check + QR + public resolver — the pilot is a real passport, not a mockup.

Steps 11–12

Registry-compatible identifiers and SHA-256 versioning keep every change auditable.

Start step 10 — free pilot Battery passport 2027 What is a DPP?

Sources: Regulation (EU) 2023/1542, Art. 77 & Annex XIII — EUR-Lex · ESPR Regulation (EU) 2024/1781 — EUR-Lex